📈 Live Market Tracking
Every NSE and BSE corporate filing, read and explained by AI within minutes — impact, key figures, short/long-term view and what to watch.
Live · AI analyzer runs every 5 min (07:00–23:55 IST)
0 analysed today
FollowTelegram
0
Today
152,139
All-time analysed
43,645
Positive
6,747
Negative
92,898
Neutral
8,781
Watch
📊 Last 7 days — analysed filings by sentiment
Note: These are AI-generated, educational summaries of public NSE
filings — grounded in each document, but not investment advice and possibly incomplete.
Verify against the original filing and consult a SEBI-registered adviser before acting.
23 announcements match the current filters (relevance ≥ 5).
MBEL Q3 FY26 Net Profit Jumps 43.7% YoY to ₹25.49 Cr; Revenue Grows to ₹351.51 Cr
M&B Engineering Limited (MBEL) reported a strong financial performance for the quarter ended December 31, 2025, with consolidated net profit rising 43.7% YoY to ₹25.49 crore. Revenue from operations increased by 7.1% YoY to ₹351.51 crore, driven by steady demand in the Pre-Engineered Buildings and structural steel segments. The company also announced a postal ballot to ratify its pre-IPO ESOP scheme to ensure compliance with SEBI regulations. Despite an exceptional loss of ₹1.15 crore, the company maintained healthy margins and reported a basic EPS of ₹4.46 for the quarter.
Key Highlights
Consolidated Revenue from operations grew 7.1% YoY to ₹35,150.94 Lakhs.
Net Profit for the quarter surged 43.7% YoY to ₹2,548.91 Lakhs from ₹1,773.09 Lakhs.
Nine-month (9M FY26) revenue reached ₹89,601.52 Lakhs with a total PAT of ₹6,563.51 Lakhs.
Board approved a postal ballot for the ratification of the 'M&B Engineering Limited Employee Stock Option Plan 2024'.
Basic and Diluted EPS increased to ₹4.46 for Q3 FY26 compared to ₹3.55 in Q3 FY25.
👀 What to Watch
Investors should view the strong bottom-line growth and margin expansion as a positive sign of operational efficiency. The stock remains a watch for further growth in the infrastructure and industrial construction sectors.
MBEL Secures Domestic PEB and Structural Steel Order Worth INR 47.66 Crores
M & B Engineering Limited (MBEL) has bagged a significant domestic order valued at INR 47.66 Crores plus GST. The contract involves the design, engineering, manufacturing, and supply of Pre-Engineered Buildings (PEB) and structural steel. A portion of the order, worth INR 7.09 Crores, will be executed by its wholly-owned subsidiary, Phenix Building Solutions Private Limited, for erection services. The project is expected to be completed within a short timeframe of approximately 5 months, providing immediate revenue visibility.
Key Highlights
Total domestic order value of INR 47.66 Crores plus GST
Includes INR 7.09 Crores erection order for subsidiary Phenix Building Solutions
Project execution timeline is approximately 5 months
Scope covers design, engineering, manufacturing, and supply of PEB and structural steel
👀 What to Watch
Investors should view this as a positive development for short-term revenue growth and monitor the company's execution efficiency over the next two quarters.
MBEL Secures Domestic Order Worth INR 63.50 Crores for Pre-Engineered Buildings
M & B Engineering Limited (MBEL) has secured a significant domestic contract valued at INR 63.50 Crores plus GST for the design and supply of Pre-Engineered Buildings (PEB). The order includes a specific component of INR 12.34 Crores for erection services to be executed by its wholly-owned subsidiary, Phenix Building Solutions Private Limited. This contract is expected to be completed within a short timeframe of 8.5 months. The win strengthens the company's order book and provides clear revenue visibility for the upcoming quarters.
Key Highlights
Total domestic order value of INR 63.50 Crores plus GST for PEB and structural steel
Execution timeline is set for 8.5 months, indicating rapid revenue realization
Includes an INR 12.34 Crore erection order for subsidiary Phenix Building Solutions Private Limited
Scope covers design, engineering, manufacturing, and supply of structural steel components
The contract is with a domestic entity on an arm's length basis with no promoter interest
👀 What to Watch
Investors should view this as a positive development for MBEL's growth trajectory and monitor the company's ability to execute within the tight 8.5-month window. This order win validates the company's competitive position in the structural steel and PEB segment.