📈 Live Market Tracking
Every NSE and BSE corporate filing, read and explained by AI within minutes — impact, key figures, short/long-term view and what to watch.
Live · AI analyzer runs every 5 min (07:00–23:55 IST)
0 analysed today
FollowTelegram
0
Today
152,139
All-time analysed
43,645
Positive
6,747
Negative
92,898
Neutral
8,781
Watch
📊 Last 7 days — analysed filings by sentiment
Note: These are AI-generated, educational summaries of public NSE
filings — grounded in each document, but not investment advice and possibly incomplete.
Verify against the original filing and consult a SEBI-registered adviser before acting.
118 announcements match the current filters (relevance ≥ 5).
ACME Solar Commissions 34.6 MW BESS Capacity in Rajasthan; Cumulative Reaches 245.5 MW
ACME Solar Holdings Limited has successfully commissioned an additional 34.598 MW / 155.493 MWh of Battery Energy Storage System (BESS) capacity in Bikaner, Rajasthan. The project, executed through its subsidiary ACME Surya Power, is set to begin commercial operations on May 29, 2026. This addition brings the cumulative commissioned capacity of the project to 245.536 MW / 1103.392 MWh. This expansion signifies a steady scale-up in the company's renewable energy storage capabilities.
Key Highlights
Commissioned additional 34.598 MW / 155.493 MWh BESS capacity in Bikaner, Rajasthan
Commercial operation date (COD) for the new capacity is set for May 29, 2026
Cumulative commissioned capacity for the project now stands at 245.536 MW / 1103.392 MWh
The project is managed by wholly owned subsidiary ACME Surya Power Private Limited
👀 What to Watch
Investors should recognize this as a positive operational milestone that will contribute to future revenue streams. Monitor the company's progress in achieving full capacity for its ongoing BESS projects.
ACME Solar Signs 25-Year PPA with SECI for 300 MW Peak Power Project at Rs 6.28/Unit
ACME Solar Holdings has executed a 25-year Power Purchase Agreement (PPA) with the Solar Energy Corporation of India (SECI) for a 300 MW / 1,200 MWh project. The project, awarded under the FDRE Tranche VII tender, carries a healthy tariff of Rs. 6.28 per unit and requires a minimum annual availability of 85%. This agreement increases the company's PPA-signed portfolio to 6,570 MW, which is approximately 81% of its total contracted portfolio of 8,070 MW. The project is scheduled to commence supply by May 28, 2028, providing long-term revenue visibility.
Key Highlights
Signed 25-year PPA with SECI for 300 MW / 1200 MWh capacity at a tariff of Rs. 6.28 per unit
Project requires 4 hours of assured peak power during non-solar hours with 85% annual availability
Scheduled Commencement of Supply Date (SCSD) is fixed for May 28, 2028
Total PPA-signed portfolio increased to 6,570 MW out of a total contracted 8,070 MW
Project utilizes existing night-time connectivity at high irradiation zones for optimization
👀 What to Watch
Investors should note the strong tariff rate and long-term revenue security with a AAA-rated counterparty. Monitor the company's execution progress toward the 2028 commencement date and its ability to maintain the high availability standards required.
ACME Solar Subsidiary ACME Platinum Urja Assigned [ICRA]A- Rating for Rs 800 Cr Loan
ICRA Limited has assigned a long-term rating of [ICRA]A- with a stable outlook to ACME Platinum Urja Private Limited, a wholly-owned subsidiary of ACME Solar Holdings. The rating pertains to a long-term fund-based term loan facility amounting to Rs 800 crore. This assignment reflects the creditworthiness of the subsidiary and its ability to service significant long-term debt obligations. The disclosure was made voluntarily by the parent company, indicating a commitment to transparency regarding subsidiary-level financing.
Key Highlights
ICRA assigned a rating of [ICRA]A- (Stable) for a Rs 800.00 crore long-term term loan.
The rating is for ACME Platinum Urja Private Limited, a 100% wholly-owned subsidiary.
The 'Stable' outlook suggests a low probability of rating change in the near to medium term.
The rating rationale is publicly available, providing further transparency for debt investors.
👀 What to Watch
Investors should view this as a positive development for the company's project financing capabilities. No immediate action is required, but it confirms the subsidiary's ability to secure large-scale debt at investment-grade ratings.
ACME Solar FY26 Revenue Jumps 59% to ₹2,507 Cr; 2.3 GWh BESS Generating ₹2.2 Cr Daily
ACME Solar reported a robust FY26 with revenue increasing 59% YoY to ₹2,507 crore and PAT reaching ₹498 crore. A key growth driver is the commissioning of 2.3 GWh of Battery Energy Storage Systems (BESS), which is currently earning ₹2.2 crore per day in the merchant market with 88-90% efficiency. The company's total portfolio stands at 8.1 GW, supported by a significant under-construction pipeline of 5.1 GW. Management also successfully reduced interest costs by 150 bps through refinancing ₹3,300 crore of debt.
Key Highlights
FY26 Revenue grew 59% YoY to ₹2,507 crore with EBITDA margins exceeding 90%.
Commissioned 2.3 GWh BESS capacity generating ₹2.2 crore daily net realization on merchant basis.
Total portfolio reached 8,071 MW with 5.1 GW currently under construction and 3,280 MW of PPAs signed.
Refinanced ₹3,300 crore debt, lowering interest rates by 150 bps to a weighted average of 8.4%.
Power generation for FY26 surged 61% YoY to 6,464 million units with 99% grid availability.
👀 What to Watch
Investors should maintain a positive outlook given the strong operational ramp-up in BESS and industry-leading EBITDA margins. Monitor the timely execution of the 5.1 GW under-construction pipeline to ensure sustained long-term growth.
ACME Solar Commissions 33.33 MW BESS Capacity in Rajasthan; Total Reaches 233.34 MW
ACME Solar Holdings Limited, through its subsidiary ACME Sun Power Private Limited, has commissioned 33.333 MW / 160.484 MWh of Battery Energy Storage System (BESS) capacity in Rajasthan. The commercial operation date (COD) for this new capacity is scheduled for May 13, 2026. This addition brings the subsidiary's total commissioned capacity to 233.336 MW / 1123.424 MWh. This development highlights the company's progress in the critical energy storage sector, which is essential for renewable energy integration.
Key Highlights
Commissioned 33.333 MW / 160.484 MWh BESS capacity in Phalodi and Jodhpur districts, Rajasthan.
Commercial operation date (COD) for the project is set for May 13, 2026.
Total commissioned capacity for subsidiary ACME Sun Power reached 233.336 MW / 1123.424 MWh.
The project was executed through the company's wholly owned subsidiary, ACME Sun Power Private Limited.
👀 What to Watch
Investors should view this as a positive operational milestone that will contribute to revenue growth. Monitor the company's future BESS project pipeline as storage becomes a key component of India's renewable energy strategy.
ACME Solar Commissions 33.33 MW / 160.48 MWh BESS Capacity in Rajasthan
ACME Solar Holdings Limited, through its subsidiary ACME Sun Power Private Limited, has successfully commissioned an additional 33.333 MW / 160.484 MWh of Battery Energy Storage System (BESS) capacity in Rajasthan. The project, located in the Phalodi and Jodhpur districts, is scheduled to commence commercial operations on May 13, 2026. This expansion brings the subsidiary's total commissioned capacity to 233.336 MW / 1123.424 MWh. This development enhances the company's operational footprint in the high-growth energy storage sector.
Key Highlights
Commissioned 33.333 MW / 160.484 MWh BESS capacity on May 11, 2026
Commercial Operation Date (COD) for the new capacity is set for May 13, 2026
Total commissioned capacity for subsidiary ACME Sun Power reaches 233.336 MW / 1123.424 MWh
Project is strategically located in the renewable-rich region of Badi Sid, Rajasthan
👀 What to Watch
Investors should note this as a positive operational milestone that will contribute to revenue growth from May 2026. The company's focus on Battery Energy Storage Systems (BESS) positions it well for India's evolving renewable energy landscape.
Acme Solar Incorporates 4 New Subsidiaries for Renewable Energy Projects
Acme Solar Holdings Limited has incorporated four new wholly owned subsidiaries on May 09, 2026, to focus on the development and operation of renewable energy projects. The new entities are ACME Greentech Twenty, Twenty Two, Twenty Three, and Twenty Four Private Limited. Each subsidiary has an initial paid-up share capital of Rs. 1,00,000, consisting of 10,000 equity shares at Rs. 10 each. This move indicates a strategic expansion of the company's project pipeline in the power generation sector.
Key Highlights
Incorporation of 4 new wholly owned subsidiaries on May 09, 2026
Initial investment of Rs. 1,00,000 per subsidiary for 100% shareholding
Subsidiaries focused on development and operation of renewable energy projects
Total initial capital outlay of Rs. 4,00,000 across all four new entities
👀 What to Watch
Investors should view this as a positive step toward future capacity expansion and monitor these entities for upcoming project wins or PPA signings.
Acme Solar FY26 Net Profit Hits ₹6,989 Million; Q4 Income at ₹6,572 Million
Acme Solar Holdings Limited reported a consolidated total income of ₹21,517 million for the financial year ended March 31, 2026. The company's net profit for the full year stood at ₹6,989.33 million, with the fourth quarter contributing a significant ₹3,393.52 million. The balance sheet remains robust with reserves totaling ₹54,428.18 million against an equity share capital of ₹11,051.81 million. The annual Earnings Per Share (EPS) was reported at ₹6.32.
Key Highlights
Full-year FY26 consolidated total income reported at ₹21,517.00 million.
Consolidated net profit for FY26 reached ₹6,989.33 million.
Q4 FY26 net profit of ₹3,393.52 million represents nearly 48% of the annual profit.
Annual Earnings Per Share (EPS) stood at ₹6.32 for the period ended March 31, 2026.
Total reserves (excluding revaluation reserve) were strong at ₹54,428.18 million.
👀 What to Watch
The strong Q4 performance and healthy reserves indicate a solid financial position; investors should maintain their positions and monitor future project pipeline announcements.
ACME Solar FY26 PAT Jumps 98.5% to ₹498 Cr; Commissions 2.32 GWh BESS Capacity
ACME Solar reported a robust financial performance for FY26, with total revenue growing 59.2% YoY to ₹2,507 crore and PAT nearly doubling to ₹498 crore. The company successfully commissioned 2.32 GWh of Battery Energy Storage System (BESS) capacity, which is already generating a net realization of approximately ₹2.2 crore per day through merchant arbitrage. The operational portfolio reached 2,990 MW, supported by a massive under-construction pipeline of 5,081 MW. Management has set an aggressive long-term target to reach 10 GW of generation capacity and 20 GWh of BESS capacity by 2030.
Key Highlights
FY26 Revenue increased by 59.2% YoY to ₹2,507 Cr, while EBITDA rose 61.2% to ₹2,265 Cr.
PAT for FY26 surged by 98.5% to ₹498 Cr compared to ₹251 Cr in the previous fiscal year.
Commissioned 2.32 GWh of BESS capacity, delivering a net realization of ~₹2.2 Cr/day via merchant/short-term peak power contracts.
Total portfolio stands at 8,071 MW with 3,280 MW of PPA-signed capacity currently under construction.
Successfully refinanced ₹3,300 Cr of debt for operational projects, achieving a significant interest rate reduction of ~150 bps.
👀 What to Watch
Investors should note the company's successful pivot into high-margin BESS merchant operations and its strong execution in the renewable space. The significant reduction in interest costs and doubling of profits make it a strong growth play in the green energy sector.
Acme Solar FY26 PAT Doubles to INR 498 Cr; Revenue Jumps 59% to INR 2,507 Cr
Acme Solar reported a stellar FY26 performance, with Profit After Tax (PAT) nearly doubling to INR 498 Cr from INR 251 Cr in the previous year. Revenue grew by 59% YoY to INR 2,507 Cr, driven by capacity additions and higher generation. The company successfully commissioned 2.31 GWh of Battery Energy Storage Systems (BESS), which is now contributing approximately INR 2.2 Cr per day in net realization. With a massive under-construction pipeline of 5,081 MW and improved interest rates through refinancing, the company shows strong growth momentum.
Key Highlights
FY26 PAT surged 98.5% YoY to INR 498 Cr, while EBITDA grew 61.2% to INR 2,265 Cr.
Commissioned 2.31 GWh of BESS capacity, delivering a net realization of ~INR 2.2 Cr per day.
Total portfolio stands at 8,071 MW, including 2,990 MW operational and 5,081 MW under construction.
Refinanced INR 3,300 Cr of debt for operational projects, reducing interest rates by 150 bps.
Cash Return on Equity (ROE) for FY26 reached 20.1% with an EBITDA margin of 90.3%.
👀 What to Watch
Investors should note the company's successful transition into high-margin storage solutions (BESS) and its robust 5 GW execution pipeline. The significant reduction in borrowing costs and high cash ROE make it a strong play in the renewable energy sector.
Acme Solar Approves FY26 Results; Appoints Arun Chopra as New CFO
Acme Solar Holdings has approved its audited standalone and consolidated financial results for the fiscal year ended March 31, 2026, with auditors issuing an unmodified opinion. A significant leadership transition was announced as Group CFO Rajat Kumar Singh resigned, replaced by internal veteran Arun Chopra, who brings 30 years of experience. The board also moved to amend the ACME Employee Stock Option Plan 2024 to include employees of subsidiaries and holding companies. Additionally, the company elevated senior leaders to Director roles in Project and Corporate Finance to bolster its strategic financial management.
Key Highlights
Approved Audited Standalone and Consolidated Financial Results for FY26 with an unmodified audit opinion.
Appointed Mr. Arun Chopra as Chief Financial Officer effective May 8, 2026, following the resignation of Rajat Kumar Singh.
Proposed amendments to the ACME Employee Stock Option Plan 2024 to extend benefits to subsidiary and holding company employees.
Elevated Purushottam Kejriwal to Director-Project Finance and Ankit Verma to Director-Corporate Finance & Investor Relations.
Re-appointed M/s AAPT & Associates as Internal Auditors for a six-month period ending September 30, 2026.
👀 What to Watch
Investors should review the detailed financial statements for year-on-year growth metrics and monitor how the new CFO leadership impacts the company's project financing and investor relations.
ACME Solar Subsidiary Commissions 8 MW Wind Power Project in Gujarat
ACME Solar Holdings Limited has announced the successful commissioning of an 8 MW wind power project in Surendaranagar, Gujarat. The project was executed through its subsidiary, ACME Eco Clean Energy Private Limited, and received the official certificate from the Gujarat Energy Development Agency (GEDA) on May 05, 2026. This operational milestone follows previous progress updates provided in April 2026. The commencement of commercial operations will contribute to the company's renewable energy portfolio and future revenue streams.
Key Highlights
Subsidiary ACME Eco Clean Energy Private Limited received the Certificate of Commissioning from GEDA
The project adds 8 MW of wind power capacity located in Surendaranagar, Gujarat
Commissioning certificate is dated May 05, 2026, marking the start of commercial operations
The announcement follows previous regulatory intimations dated April 08 and April 13, 2026
👀 What to Watch
Investors should take note of the company's ability to execute and commission projects on schedule. While 8 MW is a modest addition, it demonstrates steady operational progress in the wind energy segment.
ACME Solar Commissions 33.33 MW BESS Capacity in Rajasthan; Total Reaches 200 MW
ACME Solar Holdings Limited has successfully commissioned an additional 33.333 MW / 160.480 MWh of Battery Energy Storage System (BESS) capacity through its subsidiary, ACME Sun Power Private Limited. Located in Rajasthan, the project is scheduled to commence commercial operations on May 06, 2026. This addition brings the subsidiary's total commissioned capacity to 200.003 MW / 962.940 MWh. The expansion highlights the company's growing execution capabilities in the critical renewable energy storage sector.
Key Highlights
Commissioned 33.333 MW / 160.480 MWh of BESS capacity in Rajasthan on May 04, 2026
Commercial Operation Date (COD) for the new capacity is set for May 06, 2026
Total commissioned capacity for subsidiary ACME Sun Power reaches 200.003 MW / 962.940 MWh
Project is located at Village Badi Sid, Tehsil-Bap, across Phalodi and Jodhpur districts
👀 What to Watch
Investors should view this as a positive operational milestone that will contribute to revenue growth from May 2026 onwards. The company's ability to scale its BESS portfolio is a key differentiator in the renewable energy market.
ACME Solar Commissions Additional 35.7 MW BESS Capacity in Rajasthan
ACME Solar Holdings Limited, through its wholly owned subsidiary ACME Surya Power Private Limited, has commissioned an additional 35.714 MW / 160.512 MWh of Battery Energy Storage System (BESS) capacity in Bikaner, Rajasthan. This expansion brings the cumulative commissioned capacity of the project to 175.223 MW / 787.387 MWh. The commercial operation date (COD) for this new capacity is scheduled for May 01, 2026. This development marks a significant step in the company's operational growth within the renewable energy storage sector.
Key Highlights
Commissioned additional 35.714 MW / 160.512 MWh BESS capacity in Bikaner, Rajasthan
Cumulative commissioned capacity reached 175.223 MW / 787.387 MWh
Commercial Operation Date (COD) for the new capacity set for May 01, 2026
Project executed through 100% subsidiary ACME Surya Power Private Limited
👀 What to Watch
Investors should monitor the revenue contribution from this newly commissioned capacity in the upcoming quarters. The successful scaling of BESS projects enhances the company's competitive edge in the green energy transition.
ACME Solar Subsidiary ACME Dhaulpur Powertech Retains CRISIL AA-/Stable Rating for Rs 990 Cr Loan
CRISIL Ratings has reaffirmed the credit rating of 'CRISIL AA-/Stable' for ACME Dhaulpur Powertech Private Limited, a wholly owned subsidiary of ACME Solar Holdings. The rating applies to bank loan facilities totaling Rs. 990 Crore. This reaffirmation indicates a high degree of safety regarding timely servicing of financial obligations and low credit risk. The stable outlook suggests that the credit profile is expected to remain steady in the medium term, reflecting consistent operational performance.
Key Highlights
CRISIL reaffirmed 'CRISIL AA-/Stable' rating for ACME Dhaulpur Powertech Private Limited
The rating covers total bank loan facilities amounting to Rs. 990 Crore
ACME Dhaulpur Powertech is a 100% wholly owned subsidiary of ACME Solar Holdings Limited
The stable outlook reflects expectations of consistent debt servicing capability and project stability
👀 What to Watch
Investors should view this as a sign of financial stability within the company's project portfolio. No immediate action is required as the rating remains unchanged, confirming the existing risk profile.
ACME Solar Operationalizes 2 GWh Battery Energy Storage System (BESS) Capacity in Rajasthan
ACME Solar has achieved a major milestone by operationalizing a cumulative 2 GWh of Battery Energy Storage System (BESS) capacity in Rajasthan. The company's operational BESS footprint now stands at 591.18 MW / 2031.24 MWh, positioning it as a leader in large-scale energy storage in India. This operationalization is a key step toward the company's ambitious goal of reaching 10 GWh of BESS capacity by 2027. With a total portfolio of 8,071 MW and a significant under-construction pipeline, the company is well-positioned to capitalize on the transition toward round-the-clock renewable energy.
Key Highlights
Operationalized a cumulative 2,031.24 MWh (2 GWh) of BESS capacity across Rajasthan subsidiaries.
Current operational BESS capacity stands at 591.18 MW, aimed at enhancing grid stability and peak power management.
Company targets a total operational BESS capacity of 10 GWh by 2027.
Total diversified portfolio reaches 8,071 MW, with 2,990 MW currently operational and contracted.
Under-construction pipeline remains robust at 5,081 MW, including approximately 15 GWh of BESS installations.
👀 What to Watch
Investors should recognize this as a significant execution milestone that validates ACME Solar's technical capability in the high-growth energy storage sector. The stock warrants a positive outlook as the company progresses toward its 10 GWh storage target and converts its large under-construction pipeline into revenue-generating assets.
Acme Solar Receives Interim Stay from Rajasthan High Court on GST Demand Notice
Acme Solar Holdings Limited has secured an interim stay from the Rajasthan High Court against a show cause cum demand notice (SCN) issued by GST authorities. The court order, dated April 20, 2026, halts the operation and effect of the demand notice until further judicial orders. This provides the company with temporary relief from potential tax liabilities that were previously disclosed in March and April 2026. While the matter remains sub-judice, the stay prevents immediate enforcement or recovery actions by the tax department.
Key Highlights
Rajasthan High Court granted an interim stay on the GST show cause cum demand notice on April 20, 2026.
The stay order halts the operation and effect of the SCN until further orders from the court.
This follows previous company disclosures regarding the tax dispute made on March 29 and April 13, 2026.
The legal development provides immediate relief against potential cash outflows related to the GST demand.
👀 What to Watch
Investors should view this as a positive short-term development that mitigates immediate financial risk, though they should continue to monitor the final outcome of the litigation.
ACME Solar Commissions 16 MW Wind Power Project in Gujarat
ACME Solar Holdings Limited, through its subsidiary ACME Eco Clean Energy Private Limited, has successfully commissioned a 16 MW wind power project in Gujarat. The company received the official Certificate of Commissioning from the Gujarat Energy Development Agency (GEDA) on April 16, 2026. This project is located in the Surendranagar district and follows a series of progress updates provided by the company in March 2026. The commencement of operations marks a transition from construction to revenue generation for this specific capacity.
Key Highlights
Successfully commissioned 16 MW wind power capacity in Surendranagar, Gujarat
Received official Certificate of Commissioning from GEDA dated April 16, 2026
Project executed through subsidiary ACME Eco Clean Energy Private Limited
Follows a series of project updates issued on March 17, 19, and 26, 2026
👀 What to Watch
Investors should note the company's ability to execute and commission projects within its pipeline, which will contribute to incremental revenue growth. Monitor the company's total operational capacity versus its under-construction portfolio for long-term valuation.
ACME Solar Files Writ Petition in Rajasthan High Court Against GST Demand Notice
ACME Solar Holdings Limited has filed a civil writ petition in the Rajasthan High Court on April 13, 2026, to challenge a show cause cum demand notice (SCN) issued by GST authorities. This legal move follows a previous disclosure made by the company on March 29, 2026, regarding the receipt of the notice. By escalating the matter to the High Court, the company is actively contesting the tax authority's claims. Investors should monitor the proceedings as the outcome will determine the company's potential tax liabilities and financial impact.
Key Highlights
Filed a civil writ petition before the Hon’ble Rajasthan High Court on April 13, 2026.
The petition challenges a show cause cum demand notice (SCN) issued by GST authorities.
The legal action is a follow-up to the company's initial intimation dated March 29, 2026.
The company is seeking judicial intervention to contest the validity of the tax demand.
👀 What to Watch
Investors should monitor future disclosures to understand the specific monetary value of the GST demand and any interim stay orders from the High Court.
ACME Solar Commissions 32.366 MW / 145.435 MWh BESS Phase-IV in Rajasthan
ACME Solar Holdings has successfully commissioned the fourth phase of its Battery Energy Storage System (BESS) project in Bikaner, Rajasthan, through its subsidiary ACME Surya Power. This phase adds 32.366 MW / 145.435 MWh to the company's operational capacity, with commercial operations scheduled to begin on April 15, 2026. The total commissioned capacity for this specific project has now reached 139.509 MW / 626.875 MWh. This expansion demonstrates the company's execution capability in the high-growth energy storage segment.
Key Highlights
Commissioned 32.366 MW / 145.435 MWh capacity in Phase-IV of the BESS project
Commercial Operation Date (COD) for the new phase is set for April 15, 2026
Total commissioned capacity for the subsidiary ACME Surya Power reaches 139.509 MW / 626.875 MWh
Project is strategically located in Bikaner, Rajasthan, a hub for renewable energy
👀 What to Watch
Investors should look favorably on this capacity addition as it directly contributes to revenue growth and strengthens the company's position in the renewable storage market. Monitor the execution of remaining phases and the impact on upcoming quarterly earnings.