📈 Live Market Tracking
Every NSE and BSE corporate filing, read and explained by AI within minutes — impact, key figures, short/long-term view and what to watch.
Live · AI analyzer runs every 5 min (07:00–23:55 IST)
Latest filing: 2026-09-22 17:14
0 analysed today
FollowTelegram
0
Today
152,077
All-time analysed
43,619
Positive
6,746
Negative
92,865
Neutral
8,779
Watch
📊 Last 7 days — analysed filings by sentiment
Note: These are AI-generated, educational summaries of public NSE
filings — grounded in each document, but not investment advice and possibly incomplete.
Verify against the original filing and consult a SEBI-registered adviser before acting.
3 announcements match the current filters (relevance ≥ 5).
MIEL Wins Rs 95.94 Lakh DPR Consultancy Orders from MPRRDA Across Three Packages
Manglam Infra & Engineering Limited has received Letters of Award (LoA) from Madhya Pradesh Rural Road Development Authority (MPRRDA) totaling Rs 95.94 lakh (Rs 95,93,750). The contracts involve DPR consultancy works under Kshatigrast Bridge Nirman Yojana across three packages in Mandla and Sehore districts. The execution period for all three packages is 3 months. Against the company's TTM revenue of Rs 80 crore, the order size represents ~1.2%, making it relatively small but part of regular operational flow.
Confidence: HIGH
What changedManglam Infra secured three bridge DPR consultancy packages from MPRRDA aggregating Rs 95.94 lakh.
Why it mattersDemonstrates continued state-level government client traction, though the financial impact is modest at ~1.2% of TTM revenue.
Total Order Value: Rs. 95,93,750.00Execution Period: 03 MonthsOrder vs TTM revenue: ~1.2%
📅 Short termMarginal positive sentiment as it adds to the consultancy pipeline, with execution expected within one quarter.
📈 Long termLimited; these are standard consulting assignments that sustain operational utilization rather than meaningfully scale business size.
⚠ Risk flags
- Short execution timeline of 3 months requires timely survey clearances
- Small contract size with limited margin contribution
Key Highlights
Total order value received is Rs 95,93,750 (~Rs 0.96 crore) from MPRRDA
Comprises 3 packages: Package 14 (Mandla) for Rs 39,43,750, Package 15 (Mandla) for Rs 41,97,500, and Package 19 (Sehore) for Rs 18,52,500
Execution timeline is short at 3 months for each of the contracts
Contracts are domestic DPR consultancy works awarded on general contract conditions
👀 What to Watch
Track the execution and revenue recognition over the 3-month window, alongside larger order inflows required to expand the existing order book.
Rs 1.09 Cr Consultancy Order from Assam PWRD for Bridge Projects
Manglam Infra & Engineering Limited (MIEL) has received a Letter of Acceptance for a consultancy contract worth Rs 1.09 crore from the Government of Assam. The project involves feasibility studies, design, and DPR preparation for approximately 123 bridges under the World Bank-funded Assam Resilient Rural Bridge Program. While the contract value is relatively small at approximately 1.36% of TTM revenue (Rs 80 Cr), it highlights the company's technical consultancy capabilities. The execution timeline is notably short at just 2 months.
Confidence: HIGH
What changedMIEL has secured a new consultancy mandate in Assam, expanding its service footprint in the Northeast region under a multilateral-funded program.
Why it mattersAlthough the order size is small relative to the TTM revenue, consultancy services typically carry higher margins than EPC work and strengthen the company's relationship with state-level infrastructure departments.
Order value: Rs 1,09,11,825Order vs TTM revenue: ~1.36%Execution period: 02 MonthsNumber of bridges: 123
📅 Short termThe announcement is likely to have a neutral impact on the stock price in the short term given the small contract size relative to the overall business.
📈 Long termLimited structural impact; however, it reinforces the company's strategy to diversify into high-growth verticals and maintain its empanelment with government agencies.
⚠ Risk flags
- Tight execution timeline (2 months) for a large number of bridge studies (123).
Key Highlights
Contract value of Rs 1,09,11,825 (including GST) awarded by Assam Public Works Roads Department.
Scope includes feasibility study and DPR preparation for approximately 123 bridges in Group C.
Execution timeline is set for a rapid 02 months.
Project is part of the World Bank-funded Assam Resilient Rural Bridge Program (ARRBP).
👀 What to Watch
Investors should monitor the company's ability to execute this high-volume consultancy task (123 bridges) within the tight 2-month deadline, as successful completion of World Bank-funded projects enhances technical credentials for future high-value bids.
Rs 6.51 Cr Consultancy Order Win from Jammu PW(R&B) Department
Manglam Infra & Engineering Limited (MIEL) has secured a consultancy contract worth approximately Rs 6.51 crore from the PW(R&B) Department, Jammu Zone. The project involves consultancy services for an elevated corridor (flyover) in Jammu, stretching from Amphalla Chowk to Roop Nagar. This order represents approximately 8.1% of the company's TTM revenue of Rs 80 crore. A key highlight is the exceptionally short execution timeline of just 3 months, which suggests rapid revenue recognition for this high-margin consultancy work.
Confidence: HIGH
What changedMIEL has added a new government consultancy project in the Jammu region to its order book, specifically for urban flyover infrastructure.
Why it mattersThe contract provides immediate revenue visibility for the next quarter and demonstrates MIEL's technical capability in specialized consultancy, which typically carries higher margins than pure EPC work.
Order Value: Rs 6.51 CrExecution Period: 03 MonthsOrder vs TTM Revenue: ~8.1%TTM Revenue: Rs 80 Cr
📅 Short termThe news is likely to be viewed positively by the market due to the quick-turnaround nature of the contract and its impact on the immediate quarterly top-line.
📈 Long termWhile the order is not transformative in size, it reinforces the company's strategy to diversify into high-growth verticals and new geographies like Jammu.
⚠ Risk flags
- Tight execution timeline of 3 months
- Dependency on government approvals for consultancy milestones
Key Highlights
Secured a consultancy contract valued at approximately Rs 6.51 crore.
The order represents ~8.1% of the company's TTM revenue of Rs 80 crore.
Project execution period is strictly defined as 03 months.
Client is the Office of the Chief Engineer, PW(R&B) Department, Jammu Zone.
Scope involves consultancy for an elevated corridor/flyover from Amphalla Chowk to Roop Nagar T-Junction.
👀 What to Watch
Investors should monitor the company's ability to complete this project within the tight 3-month window, as successful execution could lead to further high-velocity consultancy wins in the region.