Indian Hume Pipe Company Limited (INDIANHUME) — Multibagger Analysis
AI research on 5 Expansion / Order-win announcements
by Indian Hume Pipe Company Limited since April 2026 — deal magnitude, revenue and EPS impact,
execution risk, and the actual return since each announcement measured from the next
trading day's open and benchmarked against the Nifty Smallcap 250.
· Order win · Possible · Construction · score 48/100
Deal
Deal value₹630 Cr
Deal vs businessNew orders of Rs 1,089 Cr represent ~0.83x TTM revenue; total order book of Rs 4,730.69 Cr stands at 3.62x TTM revenue
Size vs own revenue0.83×
Execution period3.5 yr
Fundamental gradeC
AI projections
Revenue uplift (yr1 / steady)12.0% / 30.0%
EPS uplift25.0%
Upside base / bull / bear35.0% / 65.0% / -25.0%
Horizon24-36 months
Realized market record
Entry — next-day open (13 Aug 2026)₹371.8
Latest close (16 Oct 2026)₹358.4
Return since-3.6%
α vs Smallcap 250+0.5%
α vs own sectorshown once held 90+ days — Construction median is -12.9% over 173 matured picks
Positives
Total order book expanded to Rs 4,730.69 Cr (3.62x TTM revenue), providing multi-year revenue visibility across key states like Rajasthan and Telangana.
Land monetization in Pune and Bengaluru is unlocking non-core asset value, generating Rs 246.35 Cr in cash advances for Pune projects alone.
Treasury income (Rs 12.57 Cr in Q1 FY27) now exceeds finance costs (Rs 10.54 Cr), effectively turning net interest coverage positive.
Promoter holding remains high and stable at 72.34% with pledged shares fully released as of Q4 FY26.
Risks
High client concentration with 90% of order book tied to government schemes like Jal Jeevan Mission / Har Ghar Jal, risking payment delays and working capital stretches.
Trailing ROCE of 9.0% reflects low intrinsic capital efficiency characteristic of tender-driven construction and pipe manufacturing.
Margin vulnerability to input cost fluctuations (cement, steel) and delay in state government project execution schedules.
Full AI brief
Indian Hume Pipe (INDIANHUME) Equity Research Report (As-of: 2026-08-12) ## 1. Industry Context & Operational Ramp Math Indian Hume Pipe operates in pipe manufacturing and water utility infrastructure EPC. Water infrastructure execution is capital-intensive with extended working-capital cycles. Projects typically take 3 to 4 years to complete, subject to state government disbursements and environmental clearances. Industry structural growth is pegged at 10-12% CAGR. ## Ramp-Aware Execution Analysis - Total Order Book: Rs 4,730.69 Cr (3.62x TTM revenue of Rs 1,305 Cr). - New Orders Announced: Rs 1,089 Cr from Rajasthan (Rs 630 Cr) and Telangana (Rs 459 Cr), scheduled to commence execution in Q3 FY27. - Execution Timeline: Assuming a standard 3.5-year execution timeline for water infrastructure orders, annualized execution equates to approximately Rs 1,350 Cr annually. - Year 1 Revenue Uplift: Revenue is expected to grow by ~12% in FY27 to ~Rs 1,460 Cr as execution ramps up from Q3. - Steady-State Revenue Uplift: Peak execution over FY28-FY29 could lift annual revenue by 30% to ~Rs 1,700 Cr. - Margin & EPS Trajectory: EBITDA margins stand at 15.43% for Q1 FY27. Crucially, debt reduction funded by land monetization has brought quarterly finance costs down to Rs 10.54 Cr, below treasury income of Rs 12.57 Cr. This structural reduction in net interest burden allows higher operating profits to flow down to PAT, supporting steady-state EPS expansion to ~Rs 33-35. ## 2. Fundamental & Quality Assessment - Quality Gate: FAILED (ROCE at 9.0% is below the 15% threshold). However, non-core land monetization (Rs 559 Cr Bengaluru + Rs 139 Cr Pune) is de-leveraging the balance sheet and improving net debt metrics. - Minervini SEPA Grade: C. High promoter holding (72.34%), zero pledge, but core construction operations possess low pricing power due to fragmented tender-based bidding. ## 3. Scenario Analysis - Base Case (+35% upside to ~Rs 507): Steady execution of the Rs 4,731 Cr order book over 3.5 years, net debt turns zero via Pune real estate cash flows, core P/E re-rates modestly to 16x on annualized PAT of ~Rs 160 Cr. - Bull Case (+65% upside to ~Rs 620): Acceleration in Jal Jeevan Mission project clearances, faster monetization of Bengaluru land parcel, OPM sustaining above 15%, leading to PAT exceeding Rs 190 Cr. - Bear Case (-25% downside to ~Rs 280): Working capital delays due to state government payment lags, execution stalls, steel/cement inflation squeezing margins back to 10-11%. ## 4. Verdict Rationale The order book expansion to 3.6x TTM revenue alongside land monetization cash flows significantly derisks the balance sheet. While fundamental ROCE remains constrained by industry dynamics, the net interest coverage reversal and substantial order backlog place INDIANHUME as a POSSIBLE candidate for steady capital appreciation.
Analysis as of 2026-08-12 (price ₹375.35) ·
AI research, not investment advice.
· Order win · Possible · Construction · score 65/100
Deal
Deal value₹739 Cr
Deal vs businessorder = 0.566x TTM revenue
Size vs own revenue0.57×
Execution period2.0 yr
Fundamental gradeC
AI projections
Revenue uplift (yr1 / steady)21.2% / 28.3%
EPS uplift32.0%
Upside base / bull / bear45.0% / 80.0% / -20.0%
Horizon24-36 months
Realized market record
Entry — next-day open (06 Jul 2026)₹353.8
Latest close (16 Oct 2026)₹358.4
Return since+1.3%
α vs Smallcap 250+3.4%
α vs own sector+16.3%(Construction median -12.9% over 173 matured picks)
Positives
Significant order win of Rs 738.61 Cr representing 56.6% of TTM revenue, providing strong revenue visibility.
Funding is secured via JICA (Japan International Cooperation Agency), which significantly reduces payment default and working capital delay risks typical of state-funded projects.
Promoter holding is high and stable at 72.34%, showing strong alignment of interest.
Deleveraging catalyst from land monetization (Rs 559 Cr in Bengaluru and Rs 139.62 Cr in Pune) will reduce finance costs and boost net margins.
Risks
Historically low ROCE of 9.0% reflects the capital-intensive and working-capital-heavy nature of the construction sector.
High client concentration with 90% of the order book tied to the government's Har Ghar Jal Scheme.
Execution risks including raw material price volatility (steel, cement) on an Item Rate contract where cost pass-through may have lags.
Historically stretched working capital cycle due to government receivables.
Full AI brief
1. Ramp-Aware Impact Math
Order Value: Rs 738.61 Crores (including GST). Net of GST (assuming ~18%), the core order value is ~Rs 626 Crores.
Execution Timeline: 24 months for the design and build phase.
Ramp-Aware Revenue Recognition: We assume a standard S-curve execution. Year 1 will see ~40% execution (Rs 250 Cr), and Year 2 will see ~60% execution (Rs 376 Cr).
Year-1 Revenue Uplift: Rs 250 Cr represents a 19.1% uplift over TTM revenue of Rs 1,305 Cr. (Gross of GST, the nominal uplift is 21.2%).
Steady-State (Year 2) Revenue Uplift: Rs 376 Cr represents a 28.8% uplift over TTM revenue (nominal 28.3%).
Operating Margin & PAT Impact: The company's current OPM is 11.2%. Assuming a conservative 10.5% OPM on this competitive project, Year 2 incremental operating profit is Rs 39.5 Cr. At a historical net margin of ~4.5% (excluding one-off land monetization gains), the incremental PAT in Year 2 is estimated at Rs 17 Cr, translating to an incremental EPS of ~Rs 3.20 (a 12% organic EPS uplift). However, if land monetization proceeds are fully utilized to pay down the Rs 417 Cr debt, interest savings could boost EPS by an additional 20%, leading to a combined steady-state EPS uplift of 32%.
2. Industry Capital-Intensity & Expected CAGR
Capital Intensity: HIGH. The construction and pipe-laying industry requires significant working capital, mobilization advances, and bank guarantees.
Expected Industry CAGR: 12% structural growth driven by the Central Government's Har Ghar Jal Scheme and state-level water grid expansions.
3. Multibagger Quality Assessment
Financials: TTM PAT of Rs 142 Cr is distorted by a massive land monetization gain in Mar 2025 (PAT of Rs 499 Cr). Core operational PAT is much lower (~Rs 50-60 Cr annualized), making the core P/E higher than the trailing 12.8x.
ROCE: Weak at 9.0%, reflecting poor asset turnover and stretched receivables.
Debt & Promoters: Debt-to-Equity is comfortable at 0.28, and promoters hold a strong 72.34% stake with no recent dilution.
4. Valuation & Scenarios
Base Case (+45%): Successful execution of the Rajasthan project within 24 months, debt reduction using Bengaluru land monetization proceeds, and core EPS expanding to Rs 35. Target P/E re-rates to 15x (closer to peer median of 17.4x), yielding a target price of ~Rs 525.
Bull Case (+80%): Faster-than-expected execution, margin expansion to 12% due to higher-margin product mix, and complete debt elimination. Target price of ~Rs 618.
Bear Case (-20%): Delays in Rajasthan project execution, raw material cost spikes, and working capital blockage in government receivables. Target price of ~Rs 275.
5. Verdict Rationale
Indian Hume Pipe is a classic asset-heavy turnaround candidate. While the trailing ROCE is poor, the combination of a massive JICA-funded order win (56.6% of TTM revenue) and substantial non-core land monetization cash flows to clear debt makes it a POSSIBLE multibagger. It is not a 'Strong Candidate' yet due to the low operational ROCE and execution risks inherent in government contracting.
Analysis as of 2026-07-03 (price ₹343.20) ·
AI research, not investment advice.
· Expansion · Possible · Construction · score 55/100
Deal
Deal value₹461 Cr
Deal vs businessorder = 0.34x TTM revenue
Size vs own revenue0.34×
Execution period4.0 yr
Fundamental gradeC
AI projections
Revenue uplift (yr1 / steady)8.56% / 8.56%
EPS uplift4.6%
Upside base / bull / bear35.0% / 70.0% / -20.0%
Horizon24-48 months
Realized market record
Entry — next-day open (04 May 2026)₹341.0
Latest close (16 Oct 2026)₹358.4
Return since+5.1%
α vs Smallcap 250+0.6%
α vs own sector+13.5%(Construction median -12.9% over 173 matured picks)
Positives
Significant debt reduction and balance sheet strengthening via ₹698 Cr total land monetization (Bengaluru & Pune).
Strong promoter holding of 72.3% indicating high alignment of interest.
Competitive advantage from 19 localized factories, reducing heavy concrete pipe transportation costs.
Strategic shift towards higher-margin product sales (now 33% of revenue mix).
Risks
High client concentration with 90% of the order book dependent on government schemes (Har Ghar Jal).
Low core operational ROCE of 9.0% reflecting the low-margin, tender-based nature of the construction industry.
Long execution cycle of 48 months for the new irrigation orders, exposing the company to raw material price volatility (steel/cement).
Working capital risks due to potential payment delays from state government departments (TIDC and MKVDC).
Full AI brief
1. Ramp-Aware Impact Math
Indian Hume Pipe has secured two JV orders in Maharashtra with a combined company share of ₹461 Crores.
- TTM Revenue: ₹1,346 Cr
- Order Value: ₹461 Cr (representing 34.3% of TTM revenue)
- Execution Period: 48 months (4 years)
- Annualized Revenue Contribution: ₹115.25 Cr per year (straight-line assumption)
- Year-1 & Steady-State Revenue Uplift: 8.56% of TTM revenue
Earnings Impact:
Historically, the company's core PAT margin (excluding land monetization spikes) has hovered around 5.5% to 6.5%.
- Applying a conservative 6.0% PAT margin to the incremental annual revenue of ₹115.25 Cr yields an incremental annual PAT of ₹6.92 Cr.
- TTM PAT Distortion: The reported TTM PAT of ₹618 Cr is heavily distorted by a massive ₹499 Cr net profit in March 2025, which was driven by the monetization of surplus land in Bengaluru and Pune.
- Normalized PAT: If we normalize the annual PAT to ~₹150 Cr (based on H1 FY26 PAT of ₹56.6 Cr and historical non-distorted quarters), the incremental PAT of ₹6.92 Cr represents a 4.6% EPS uplift.
- If compared against the distorted TTM PAT of ₹618 Cr, the uplift is a negligible 1.1%. We use the normalized 4.6% uplift for realistic valuation purposes.
2. Industry Capital-Intensity & Expected CAGR
The water infrastructure and lift irrigation sector in India is moderately capital-intensive. While Indian Hume Pipe benefits from having 19 localized factories (which reduces transportation costs for heavy concrete pipes), the execution of large lift irrigation schemes requires significant working capital and has long gestation periods.
- Expected Industry CAGR: ~11.0% over the next 3-5 years, heavily supported by the Central Government's Har Ghar Jal scheme and state-level irrigation budgets.
- Execution Difficulty: High. Irrigation projects involve complex engineering, land acquisition clearances, and coordination with state departments (TIDC and MKVDC), making delays common.
3. Multibagger Quality Assessment
Core Profitability: The trailing ROCE stands at a low 9.0%, reflecting the highly competitive, tender-based nature of the construction industry where pricing power is limited.
Balance Sheet Strength: The key catalyst for the company is not just the order book, but the structural deleveraging. The monetization of surplus land (₹559 Cr from Bengaluru and ₹139.62 Cr from Pune) has been utilized to pay down debt, bringing the D/E ratio down to a comfortable 0.28x on a net worth of ₹1,485 Cr.
Promoter Alignment: Promoter holding is robust and stable at 72.34%.
Growth Acceleration: While core revenues have been relatively flat (ranging between ₹280 Cr and ₹390 Cr per quarter), the reduction in finance costs and the shift toward higher-margin product sales (now 33% of revenue) provide a path for margin expansion.
4. Valuation & Scenarios (As-of May 1, 2026)
Base Case (+35% Upside): Smooth execution of the ₹461 Cr order over 4 years, core PAT margins stabilize at 6.5% due to lower interest expenses, and the market re-rates the stock to a normalized P/E of 15x on core earnings. Impact horizon: 24-48 months.
Bull Case (+70% Upside): Faster-than-expected execution of the order book, core margins expand to 8.0% driven by higher-margin pipe sales, and further land monetization cash flows are announced, leading to a complete debt-free status.
Bear Case (-20% Downside): Severe delays in receivables from Maharashtra state departments stretch the working capital cycle, raw material inflation (steel/cement) squeezes margins to <4%, and core EPS growth stagnates.
5. Verdict Rationale
Indian Hume Pipe is classified as a POSSIBLE multibagger. The massive land monetization has successfully cleaned up the balance sheet, removing the overhang of high finance costs. However, the core business remains a low-ROCE, capital-intensive construction play with high government client concentration (90%). The ₹461 Cr order win is solid and provides long-term visibility, but its multi-year execution timeline means the near-term earnings impact will be gradual rather than explosive.
Analysis as of 2026-05-01 (price ₹329.75) ·
AI research, not investment advice.
Indian Hume Pipe has secured a significant water supply project in Telangana valued at ‹458.69 Crores (excluding GST). The contract is scheduled for execution over a 24-month period (2 years).
Deal Size vs. Business: The order represents 34.1% of the company's TTM revenue of ‹1346 Cr. This is a substantial order but falls well within the company's execution capabilities, avoiding the 'mega-order' execution risk threshold (>3x TTM revenue).
Ramp-Up & Revenue Recognition:
Year 1 (40% execution): We assume a standard mobilization and initial execution ramp of 40% in the first 12 months, translating to ‹183.5 Cr of recognized revenue. This represents a 13.6% year-1 revenue uplift over TTM revenue.
Steady-State (50% execution/year): Once fully ramped, the order will contribute ‹229.35 Cr annually, representing a 17.0% steady-state revenue uplift.
Margin & Earnings Impact:
The company's TTM Operating Profit Margin (OPM) stands at 12.2%. Applying this to the steady-state annual revenue contribution yields an incremental operating profit of ‹28.0 Cr.
Historically, the company's core PAT margin (excluding land monetization windfalls) has hovered around 4.5%. Applying this net margin, the steady-state incremental PAT is estimated at ‹10.32 Cr.
Core EPS Impact: Stripping out the massive ‹499 Cr land monetization gain in March 2025, the company's core annual PAT is estimated at approximately ‹100 Cr. The incremental PAT of ‹10.32 Cr represents a 10.3% steady-state EPS uplift.
2. Industry Capital Intensity & Expected CAGR
Capital Intensity (MEDIUM): While pipe manufacturing requires fixed assets (the company operates 19 factories), the primary capital drain is working capital. Government contracts often involve long payment cycles, retention money, and mobilization delays, which stretch the cash conversion cycle.
Execution Difficulty (MODERATE TO HIGH): Executing municipal water supply schemes requires extensive local coordination, right-of-way clearances, and is subject to weather-related disruptions (monsoons). However, Indian Hume Pipe's localized factory model (19 factories near project sites) mitigates transportation costs and logistical bottlenecks.
Expected Industry CAGR (11.0%): The domestic water infrastructure segment is structurally supported by the Central Government's Har Ghar Jal (Jal Jeevan Mission) and urban water improvement schemes (UIDF/AMRUT), ensuring a steady pipeline of tenders.
3. Multibagger Quality Assessment
Earnings Quality & Distortion: The trailing P/E of 2.8x is highly misleading. It is distorted by a massive one-off land monetization gain of ‹499 Cr in March 2025 (Bengaluru and Pune land sales). Adjusting for this, the core operational P/E is closer to 17x, which is reasonable but not dirt-cheap.
Financial Health: The balance sheet has structurally improved. The cash inflows from land monetization (totaling over ‹700 Cr) have been utilized to pay down debt, bringing the D/E ratio down to a comfortable 0.28x (Debt of ‹417 Cr against Net Worth of ‹1485 Cr). This deleveraging will significantly reduce finance costs going forward.
ROCE (9.0%): Trailing ROCE is low at 9.0%, reflecting the capital-intensive and low-margin nature of the core EPC business. While this does not meet the ideal Minervini SEPA threshold (>15%), the structural deleveraging and shift toward higher-margin product sales (now 33% of revenue) provide a credible path to ROCE expansion.
Promoter Alignment: Promoter holding is high and stable at 72.34%, indicating strong alignment with minority shareholders.
4. Valuation Scenarios (12-24 Month Horizon)
Base Case (25% Upside - Target: ‹406): Core execution remains steady. The Telangana order is executed on time. Deleveraging benefits flow through to the bottom line, and core EPS grows to ‹23. The market re-rates the core business to 17.5x P/E as the balance sheet quality improves.
Bull Case (55% Upside - Target: ‹504): Faster-than-expected execution of the Telangana order combined with higher-margin pipe supply. Further land monetization announcements from remaining surplus land parcels. Core EPS reaches ‹26, and the stock re-rates to 19x P/E on debt-free status.
Bear Case (-20% Downside - Target: ‹260): Severe delays in municipal clearances in Warangal, raw material cost inflation (steel/cement) squeezes margins, and government payment delays stretch the working capital cycle, forcing the company to re-leverage.
5. Verdict Rationale
Indian Hume Pipe is classified as a POSSIBLE multibagger candidate with a score of 62/100.
While the balance sheet has been phenomenally strengthened by non-operational land monetization cash flows, the core business remains a low-margin, highly competitive EPC play with high government client concentration (90% of order book). The newly bagged ‹458.69 Cr order provides excellent revenue visibility and validates their competitive positioning, but it does not fundamentally alter the low-ROCE nature of the industry overnight. We remain cautiously optimistic, waiting for operational margin expansion to match the balance sheet's newfound strength.
Analysis as of 2026-04-29 (price ₹325.00) ·
AI research, not investment advice.
· Order win · Unlikely · Construction · score 38/100
Deal
Deal value₹418 Cr
Deal vs businessorder = 0.31x TTM revenue (₹417.97 Cr vs ₹1346 Cr TTM revenue)
Size vs own revenue0.31×
Execution period4.0 yr
Fundamental gradeC
AI projections
Revenue uplift (yr1 / steady)5.0% / 7.77%
EPS uplift4.5%
Upside base / bull / bear15.0% / 35.0% / -20.0%
Horizon24-48 months
Realized market record
Entry — next-day open (27 Apr 2026)₹349.0
Latest close (16 Oct 2026)₹358.4
Return since+2.7%
α vs Smallcap 250-2.7%
α vs own sector+10.2%(Construction median -12.9% over 173 matured picks)
Positives
Strong promoter holding at 72.34% provides stability and alignment of interest.
Substantial cash cushion from land monetization (₹559 Cr Bengaluru + ₹139 Cr Pune) has significantly deleveraged the balance sheet (D/E 0.28).
100-year track record and 19 localized factories provide a competitive freight cost advantage for heavy concrete pipes.
Order book visibility is enhanced by this ₹417.97 Cr win, securing long-term revenue for the next 4 years.
Risks
Extremely low operational margins (historical PAT margin ~3-4%) and low ROCE of 9% limit capital efficiency.
High client concentration with 90% of the order book tied to government schemes (Har Ghar Jal), exposing the company to policy and budgetary shifts.
Long execution timeline of 48 months for the new order increases exposure to raw material price inflation (steel, cement).
Working capital cycle is prone to stretching due to delayed receivables from state government departments like MKVDC.
Full AI brief
1. Ramp-Aware Impact Math
Order Value: ₹417.97 Crores (excluding GST).
Execution Period: 48 months (4 years).
Annualized Revenue Contribution: ₹104.5 Crores per year.
Year-1 Revenue Uplift: Assuming a slow initial mobilization phase, we project Year-1 revenue recognition at ~₹67.3 Crores (5.0% of TTM Revenue of ₹1346 Cr).
Steady-State Revenue Uplift: Once fully ramped, the annual contribution of ₹104.5 Crores represents a 7.77% uplift over TTM revenue.
Earnings Impact:
The company's core operational PAT margin (excluding land monetization) historically hovers around 3.5% to 4.0%.
At a steady-state net margin of 4.0%, this contract will generate ~₹4.18 Crores in annual PAT.
Based on ~5.27 Crore outstanding shares, this translates to an incremental EPS of ~₹0.79 per year.
While the trailing P/E of 2.7 looks exceptionally cheap, it is highly distorted by a one-off ₹499 Crore PAT in March 2025 from land monetization. Adjusting for this, core annual PAT is closer to ₹90-100 Crores. Thus, the steady-state EPS uplift on core earnings is a modest 4.5%.
2. Industry Capital Intensity & Expected CAGR
Capital Intensity: HIGH. The construction and pipe-laying industry requires substantial working capital to fund inventory and manage long receivables cycles from government departments.
Execution Difficulty: HIGH. Irrigation projects in Maharashtra (awarded by MKVDC) are notorious for execution delays, land acquisition hurdles, and slow payment clearances.
Expected Industry CAGR: 9.0%. Driven primarily by central schemes like Har Ghar Jal, though state-level irrigation budgets remain highly cyclical.
3. Multibagger Quality Assessment
EPS Growth & Acceleration: Core operational EPS is sluggish and highly volatile. The massive spike in TTM EPS (₹117.19) is non-recurring and driven by land sales, not operational excellence.
Margins & ROCE: Operating profit margins (OPM) are low at 12.2%, and ROCE is weak at 9.0%, failing to meet the 15% quality gate.
Balance Sheet: Debt of ₹417 Cr is well-covered by the net worth of ₹1485 Cr (D/E of 0.28), thanks to the cash inflows from land monetization. However, this cash is a one-time buffer rather than a structural improvement in core business profitability.
Promoter Holding: Strong and stable at 72.34%, which is a key positive for governance.
4. Scenario Calibration & Valuation
Base Case (+15%): The order is executed steadily over 4 years at a 4% net margin. The stock re-rates slightly as the market prices in stable, albeit low-margin, cash flows. Target Price: ₹368.
Bull Case (+35%): Faster-than-expected execution (36 months instead of 48) combined with further debt reduction using remaining land sale proceeds. Target Price: ₹432.
Bear Case (-20%): Execution delays, raw material cost escalation (steel/cement), and stretched working capital lead to cash flow strain. Target Price: ₹256.
5. Verdict Rationale
While the order win of ₹417.97 Cr provides decent revenue visibility, it is spread over a long 4-year period, dilution of margins is a constant threat in percentage-rate contracts, and the core business remains a low-ROCE, capital-intensive utility contractor. The cheap trailing valuation is an illusion caused by one-off land sales. Consequently, a multibagger outcome is highly unlikely.
Analysis as of 2026-04-24 (price ₹320.00) ·
AI research, not investment advice.
Verdicts and projections on this page are produced by an AI model from Indian Hume Pipe Company Limited's public exchange
filings and are not investment advice. "Return since" is measured from the opening price
of the next trading day after each announcement to the latest available close, so it reflects a price an
investor could actually have paid. See all analysed companies on
Multibagger AI.
⚠️How this site is made: Market data pages are computed automatically from NSE/BSE publications and company filings; news articles and announcement analyses are written with AI assistance, with a human in the loop: our editors review what the AI produces. Both can contain errors. Verify with the original sources before any investment decision. Not investment advice; Flash Finance is not SEBI-registered. How we use AI
⚡ Free FlashFinance Newsletters
AI-powered market intelligence in your inbox — completely free. Pick your topics; max 1 email per topic per day. Unsubscribe anytime.
✅ Everything below is 100% free — no payment, no card, ever.
🎉
You're subscribed!
A welcome email with your topics is on its way. Want it even faster? Join us on Telegram or WhatsApp: